10ENG4. The distance between the intake air and the smoke pipe must be within 300 mm (12 in) - (see fig. below).5. The head loss of the smoke pipe c
11ENG2.7.1 Separate flue kit (fig. 8)The separate flue kit code 8089909 is sup-plied with an intake diaphragm which must be used as shown in fig. 8/
12ENGmax 0,5 mmax 0,5 mC12B52149C52B52C32C42321110C82B2265612311103718313233 213236318 3Figure 9/aIMPORTANT: In type C52 the outlet and inlet flues mu
13ENGOutlet terminals for forced draft systems may be located on the outer walls of the buildings. Table 2 shows approximate, non-binding minimum dist
14ENG2.8.2 Instructions special stainless steel venting system for use with Category III appliancesZ-FLEX recommends that an experienced pr
15ENGintegrity has remained during shipping. Gaskets must be in the proper position or flue gases could leak resulting in carbon monoxide poisoning.1.
16ENG(see figure 6/a below) 1. Penetrating a combustible wall requires the use of a wall thimble. The pipe may be mortared in directly without using
17ENG(see figure 6/b - 6/d)NOTE: The vent termination must be at least 3 ft. (1 m) to a maximum of 6ft. above the roof line and 2 ft. (.61 m) higher t
18ENGNOTE: When Z-Vent must be extended above the roof line more than six (6) feet the Guy Band must be used to support the system.1. Install the Gu
19ENGNOTE: A masonry chimney flue may be used to route Z-VENT if no other appliance vents directly into the same flue without a liner. Prior to beginn
Fonderie Sime S.p.A. Via Garbo, 27 – 37045 LEGNAGO (VR)declares that:a) The materials used in the interior of the boiler are suitable for the use of
20ENGCode Part I, CSA C22.1, Electrical Code. If you must replace the electric power cable supplied with the boiler, order it exclusively from Sime. T
21ENGCN6CN2CN7KEYF Fuse (1.6 AT)PI C.H. pumpEV1-2 Gas valve coilV FanPF Smoke pressure switchVP Divertor valveM ModulatorSM C.H. sensorSS D.H.W. pr
22ENG3.1 ELECTRONIC BOARDThe electronic boards are manufactured in compliance with the ANSI and Canadian direc-tives. They are supplied with 120V and
23ENG3.3 ELECTRONIC IGNITIONIgnition and flame detection is controlled by an electrode located on the burner. These guarantee maximum safety with inte
24ENGTo obtain the maximum head available to the system, turn off the by-pass by turning the union to the vertical position (fig. 17/a).3.7 ELECTRICAL
25ENG4.2 ADJUSTMENT OF D.H.W. FLOW RATETo adjust the D.H.W. flow rate, use the flow rate adjuster (5 fig. 5). Remember that the flow rates and corre
26ENG1. Close the gas cock.2. Disassemble the burner manifold (3).3. Replace the main nozzles (6) supplied in a kit, inserting the copper washer (4).
27ENGcleaning the heat exchanger or the bur-ners, chemical products or steel brushes MUST NOT BE USED. Make sure that the tops of the burners with th
28ENGRadiators fail to heat up in winter.1. The rotary switch is on “Summer”; switch to “Winter”.2. The room stat is set too low or needs repla-cing b
29ENG5 EXPLODED VIEWS / VUES ÉCLATÉES
3ENGInstallation Instruction and User and Care GuideTABLE OF CONTENTS1 DESCRIPTION OF THE BOILER 41.1 INTRODUCTION 41.2 DIMENSIONS 42 INSTALLATION
30ENGFonderie Sime S.p.A. - Via Garbo, 27 - 37045 Legnago (Verona) - Tel. +39-0442-631111 - Fax +39-0442-631292 - www.sime.itETONLEDOMNOITPIRCSEDEDOCN
31ENGFonderie Sime S.p.A. - Via Garbo, 27 - 37045 Legnago (Verona) - Tel. +39-0442-631111 - Fax +39-0442-631292 - www.sime.itETONLEDOMNOITPIRCSEDEDOCN
32ENGFonderie Sime S.p.A. - Via Garbo, 27 - 37045 Legnago (Verona) - Tel. +39-0442-631111 - Fax +39-0442-631292 - www.sime.itETONLEDOMNOITPIRCSEDEDOCN
33ENGFonderie Sime S.p.A. - Via Garbo, 27 - 37045 Legnago (Verona) - Tel. +39-0442-631111 - Fax +39-0442-631292 - www.sime.itETONLEDOMNOITPIRCSEDEDOCN
34ENG
35ENG
315 Oser Avenue • Hauppauge, NY 11788Tel: (631) 694-1800 • Fax: (631) 694-1832www.embassyind.com
4ENG1.1 INTRODUCTIONCelsior boilers are gas-fired thermal applian-ces for central heating and domestic hot water production, designed and manufactu-
5ENGCLEARANCES FROM COMBUSTIBLE MATERIALS:Bottom: 0 mm (0 in.)Sides: 0 mm (0 in.)Rear: 0 mm (0 in.)Front: 0 mm (0 in.)Top: 0 mm (0 in.)Flue (superate
6ENG61211109875431131419KEY1 Fan2 Main exchanger3 Combustion chamber4 Gas valve5 D.H.W. plate exchanger6 Divertor valve7 C.H. sensor (SM)8 100°C sa
7ENGThe installation must conform to the require-ments of the Authority having jurisdiction or, in the absence of such requirement, to the National Fu
8ENGpipe size of other materials. The sections of the piping making up the system must be such as to guarantee a supply of gas sufficient to cover the
9ENGpressure, with the system cold, must be betwe-en 1 and 1.2 bar (14.5 and 17.4 psi). During system filling you are recommended to keep the main sw